C. Steinweg
Steinweg Hub
Vessel Productivity Report
C. Steinweg Oman LLC · Sohar
Sign in
Welcome back. Please enter your details.
Forgot password?
© 2026 C. Steinweg Oman LLC. All rights reserved.
C. Steinweg
This vessel
Planning Tally Production
Quay · all vessels
Control Room Dispatch Overview Statistics
Vessels Settings Guide Back to Hub
All systems online
C. Steinweg Oman LLC
AD
Admin
View only — your role can't edit this screen.

Vessel details

TALL-56-Rev.04

Cargo planning

Cargo typeCat.IM/EXPack list H1H2H3H4H5H6 H7H8H9H10H11H12 TotalPlan hrs

Planned completion

Total planned
—
gang-hours
Start ops
—
1 Gang
—
2 Gangs
—
3 Gangs
—
Long End
—
Cargo typeIM/EXTotal (ton/pcs)Standard rate (per net hr)Planned gang-hrs

Gang planning — finish all holds together

load-balanced
Scenarios

More gangs than the sweet spot won't finish earlier — one hold becomes the limit.

Gang allocation

Tally — shifts

Add shifts here — each one is listed below the previous, like the Excel sheet. Fill Planning (or import a packing list) first so the cargo dropdowns match.

Per-hold progress (load vs done)

HoldLoadDoneRemainingProgress

Production dashboard

Overall completion
Production per day — whole boat

Where the time went

net working vs delays · per shift

What was done per hold, per day

darker = more produced

Balance remaining

whole boat · still to load/discharge
Per hold
HoldLoadDoneBalance%
Per cargo
CargoLoadDoneBalance%

Performance vs standard

per cargo · whole boat · are we meeting the rate?
CargoStandard (per net hr)Achieved (per net hr)vs Target

Shift log — what was worked per hold

scroll right for all holds →

Each row = one shift / gang. Net hrs = duration − break − idle/delays. Productivity = quantity ÷ net hrs. Rolls up from the Tally shifts.

QUAYPULSE
Sohar Dispatch · Control Room
07:30:00
Live shift board
Active vessels
0
Avg completion
0%
Below target pace
0
Gangs deployed
0

Vessels on the quay — tap to focus

—
—
—
—
Completion
Running vs norm
Remaining 0 pcs · 0 gang(s) now

Per hold — done vs load

Delay split — where time is lost

ControllableExternal
0h we can act on · 0h external

This vessel at a glance

0%
complete · —
Status —
Berth — · —

Gate & yard throughput

Reserved — no live gate/yard feed yet. Never faked.

Dispatch — Quay Control

Every vessel on the quay, what it carries, how it's going — and where to put your gangs this shift.

Gangs available
this shift
Recommended deployment this shift — which gangs, which holds

How the advice works: every active vessel first gets one gang so no berth sits idle. Each extra gang then goes to the vessel that would otherwise finish latest — keeping the whole quay balanced. Within a vessel, gangs work the heaviest remaining holds first. Change the “gangs available” number and the plan re-balances.

Quay overview

Operations analytics

All vessels · where are we losing production, and where can we act — built from all recorded shifts.

Delay analysis — where production is lost

Controllable vs external
Lost hours by cause (biggest first)
CauseTypeHours lost (all vessels)Occurrences% of delays€ lost (est.)

Berth occupancy & performance

all vessels · per berth
BerthVesselsShifts (gangs)Delay hrsUtilisation

Crane & operator performance

Productivity per crane
Operators — best & needs attention
OperatorCargo doneProductivityNet hrs

Productivity per cargo — achieved vs standard (your benchmark)

Saved vessels

VesselBerthCommodityStatusShiftsUpdated
Vessel line-up — Berth Planning